The Silver Line is the Massachusetts Bay Transportation Authority's (MBTA's) sole Bus Rapid Transit line, running in two sections, from Dudley Square in Roxbury to downtown Boston, Massachusetts and from South Station to several points in South Boston. Extensions are planned in South Boston and to Logan Airport in East Boston, and a connection is planned between the two sections.
The Silver Line is planned to be built in three phases; only phase I and part of phase II have been completed as of early 2005.
Silver Line buses are wheelchair ramp equipped using a kneeling bus and a flip-out ramp. See MBTA accessibility.
Table of contents |
Phase I
Phase I of the Silver Line runs between Dudley Square in Roxbury and downtown Boston (with free transfer slips provided to all subway lines but the Blue Line). The full line started running July 20, 2002, replacing the Washington Street Elevated, which closed in 1987. In the interim, the route was served by the 49 bus (which had existed as a feeder route before 1987); Silver Line phase I is internally known as the 749.[1]
Station listing
| Station | Opened | Transfers and notes |
|---|---|---|
| Dudley Square | July 20, 2002 | |
| Melnea Cass Boulevard | July 20, 2002 | |
| Lenox Street | July 20, 2002 | |
| Massachusetts Avenue | July 20, 2002 | |
| Worcester Square | Late 2002 | |
| Newton Street | July 20, 2002 | |
| Union Park Street | July 20, 2002 | |
| East Berkeley Street | July 20, 2002 | |
| Herald Street | July 20, 2002 | |
| New England Medical Center | July 20, 2002 | Orange Line |
| Chinatown | July 20, 2002 | Orange Line northbound buses only |
| Boylston | July 20, 2002 | Green Line southbound buses only |
| Downtown Crossing at Temple Place | July 20, 2002 | Orange Line and Red Line at Downtown Crossing |
Phase II
Phase II of the Silver Line built a new tunnel from South Station to Boston's World Trade Center and 1/2 mile further east to Silver Line Way. (This section was originally referred to as the South Boston Piers Transitway.) This section opened on Friday, December 17, 2004, with the first route (Silver Line Waterfront, officially 746) running only to Silver Line Way.
When dual-mode buses were placed in service on December 31, 2004, two extensions opened:
- SL2 (746–1) Boston Marine Industrial Park (BMIP)
- SL3 (746–2) City Point via Boston Marine Industrial Park, extended weekdays until 19:00 to Farragut Road on April 9, 2005
The Silver Line Waterfront service continues to run using trackless trolleys.
As not enough dual-mode buses were available, some rush-hour service was provided by CNG buses, with transfers at Silver Line Way. Through service was suspended after January 5, and was not brought back until March 5, with all buses dual-mode starting on March 14. Beginning on March 26, late night and weekend trips ran combined, running both around the BMIP loop and to City Point.
On January 2, CNG buses started running on a Sunday-only (16:00 to 22:00 only) shuttle route (746–5) between Silver Line Way and the airport terminals (but not Airport on the Blue Line). The agreement with the Massachusetts Department of Environmental Protection called for airport service by January, but the MBTA didn't yet have enough buses for full service.[2]
Two more services are planned:
- SL1 Logan Airport Terminals
- SL4 Andrew Station via Boston Convention and Exhibition Center and D Street
When these open, the service running only to Silver Line Way will be discontinued.
Station listing
| Station | Routes | Opened | Transfers and notes |
|---|---|---|---|
| South Station | all | December 17, 2004 | Red Line, MBTA Commuter Rail, Amtrak, intercity buses |
| Courthouse | all | December 17, 2004 | |
| World Trade Center | all | December 17, 2004 | |
| Silver Line Way | all | December 17, 2004 | |
| Northern Avenue at Harbor Street | SL2, SL3 | December 31, 2004 | |
| Northern Avenue at Tide Street | SL2, SL3 | December 31, 2004 | |
| 25 Dry Dock Avenue | SL2 (outbound) | December 31, 2004 | |
| 88 Black Falcon Avenue | SL2 (terminal) | December 31, 2004 | |
| Black Falcon Avenue at Design Center Place | SL2 (inbound) | December 31, 2004 | |
| Dry Dock Avenue at Design Center Place | SL2 (inbound), SL3 | December 31, 2004 | |
| Summer Street at Power House Street | SL3 | December 31, 2004 | |
| East First Street at M Street | SL3 | December 31, 2004 | |
| City Point | SL3 | December 31, 2004 | continues to Farragut Road weekdays until 19:00 |
Phase III
Phase III comprises the connection of the two halves of the Silver Line via an underground busway from Boylston station on the Green Line to South Station. It has not been funded yet and is not expected to be completed until after 2010. At this time, three possible routings are being debated. The total cost for the un-determined route is expected to be US$780 million.
Future BRT options
In addition to the Silver Line, BRT is being considered as a means of implementing the Urban Ring Project and providing improved crosstown service.
Silver Line critiques
In MBTA nomenclature, BRT lines are named by colors, not by number. This system is intended to equate BRT lines with subway lines as equivalent services. There are historical reasons for this equation. The Silver Line is the result of a court order mandating restoration of local service after the Washington Street Elevated portion of the Orange Line was demolished and the Orange Line was re-routed onto the Southwest Corridor right-of-way. Proposals to build a new subway line under Washington Street or a new trolley line along Washington Street were deemed impractical (for the same reasons that the Orange Line was moved), which is why BRT was chosen as a solution.
As for phase II, BRT was chosen despite the partly separate right-of-way because the Ted Williams Tunnel to Logan Airport is an Interstate Highway (I-90), and Interstate Highway standards do not allow rail tracks in the road.
Detractors of Silver Line service insist that BRT is still a bus, not a high-speed transit line, and provides equivalent quality and speed to other buses. Logically, it is therefore undeserving of the dignity of equality with Boston's subway lines. These groups sometimes refer to the Silver Line as the "#49 bus" (this being the bus line with an identical routing that the Silver Line replaced) and the "Silver Lie" (used because of concerns from groups that the MBTA has reneged on a promise of real rapid transit.)
| Massachusetts Bay Transportation Authority (official site) | ||
| Red Line | Alewife – Ashmont / Braintree — Ashmont-Mattapan High Speed Line: Ashmont – Mattapan | |
| Green Line | Lechmere – Boston College (B) / Cleveland Circle (C) / Riverside (D) / Heath Street (E) | |
| Orange Line | Oak Grove – Forest Hills — Charlestown Elevated – Atlantic Avenue Elevated – Washington Street Elevated | |
| Blue Line | Wonderland – Bowdoin | |
| Buses | Silver Line: Dudley – Downtown Crossing; South Station – various points ---- List – Crosstown buses – Former streetcars – Key routes – Urban Ring | |
| Commuter Rail | Greenbush – Plymouth/Kingston – Middleborough/Lakeville – Fairmount – Attleborough/Stoughton – Franklin – Needham – Framingham/Worcester – Fitchburg – Lowell – Haverhill/Reading – Newburyport/Rockport | |